weather-makers.com

25+ Years of Engineering Experience in Cold Storage.

How we engineer savings

Building a cold room is the smaller bill. Running it is the bigger one.

Electricity, spoiled stock and repairs add up for years after
a cold room isbuilt. We design to cut all three, and we show you
the numbers before you commit.

Four places we engineer savings

Every saving has a specific design decision behind it.

Lower Energy

Power is usually the largest running cost. We size the room to your real load, not a template.

Lower Losses

Every degree of drift and every humidity swing costs you stock.

Lower Maintenance

Fewer breakdowns, and the ones that happen are caught early.

Lower Lifecycle Cost

We quote the cost of owning the cold room, not only the cost of building it.

Before you sign any quote

Five questions to ask any cold room builder.

We are happy to answer every one of these for our own designs.

1.What will it cost to run each month, at my load?

2.How was the insulation and refrigeration capacity calculated?

3.How will I know if the temperature drifts at night?

4.What does yearly maintenance cost, and who does it?

5.Which refrigerant is used, and is it future-proof?

How it works

From your first message to a clear number.

1

Tell us what you store.

Product, approximate capacity and location. Two minutes onthe form below.

2

We call you.

An engineer calls within 24 hours to understand your requirement and fill any gaps.

3

You get your estimate.

Build cost, running cost and expected savings, side by side, inplain numbers.

Prefer to talk first?

Call or message us directly.
+91 9879 005 900 (phone and WhatsApp)

kaushhal@weather-makers.com
Email

Mon to Sat, 10 am to 7 pm
314, Raj Corner, Pal L P Sawani Road, Pal, Surat - 395009

Your estimate includes

- Build cost range for your capacity
- Expected monthly running cost
- Where the savings come from and by how much
- Payback period against a standard build

questions

Common questions about the estimate.

How accurate is the estimate?

It is an early estimate based on what you tell us. We refine it with asite visit and your actual load before any final quote.

Can you improve a cold room I already have? Can you improve a cold room I already have?

Yes. Retrofits and upgrades are part ofwhat we do, and the estimate can compare upgrading against building new.

Scroll to Top